<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta content="text/html; charset=" http-equiv="content-type">
</head>
<body style="FONT-FAMILY: Comic Sans MS, Tahoma; FONT-SIZE: 12pt">
<p align=center><a href="http://www.kjab.com/" target=""><a 
href="http://www.kjab.com"><a href="http://www.kjab.com"><img 
style="WIDTH: 976px; HEIGHT: 208px" onmouseover="" onmouseout="" onmousedown="" 
border=0 hspace=0 alt="" 
src="cid:5644an$IN798013685912110@BroWeber-Home" 
width=976 height=208></a></a></a></p>
<p align=center><font color=#000080 size=5><strong>KJAB Expansion Update<img 
style="WIDTH: 300px; HEIGHT: 225px" onmouseover="" onmouseout="" onmousedown="" 
border=0 hspace=5 alt="" vspace=5 align=right 
src="cid:5644an$IN918013685912111@BroWeber-Home" 
width=300 height=225> Tuesday 5/14 </strong></font></p>
<p align=left>The tower work has been completed.  Today Darren and Mike 
hung the coax cable and got it clamped to the tower.  They ran the line 
inside and hooked the coax up to the flanges that go to the transmitter.  
You can see the spool that held the coax and the great idea from Duane and 
Dwight Taylor to mount the spool on a trailer in order to make it easy to 
uncoil.  Then they climbed to the top once more and re-lamped the tower and 
took all the equipment off the tower.  These guys did a great job and the 
Lord watched over them the whole way  Pray for safety as they head back 
home on Wednesday. </p>
<p align=left><img style="WIDTH: 300px; HEIGHT: 225px" onmouseover="" 
onmouseout="" onmousedown="" border=0 hspace=5 alt="" vspace=5 align=left 
src="cid:5644an$IN928013685912112@BroWeber-Home" 
width=300 height=225></p>
<p align=left> </p>
<p align=left>The engineer worked hard yesterday and today to bring the 
transmitter to life.  Although there is much to do we were excited to see 
that the transmitter made high voltage and there were no fireworks.  This 
was a concern because of the condition of the used transmitter.  Wednesday 
he will finish tuning the transmitter and making sure everything is working all 
right.  Field testing will take place when the work on the transmitter is 
complete.</p>
<p align=left> </p>
<p align=left>We need $15,000 by the end of the week.  We have a total of 
$2,250.00 so we have a ways to go..  Please keep us in your prayers and if 
the Lord directs you to send a gift our contact info is on the <a 
href="http://kjab.com/contact_us.php">Contact Us</a> portion of the 
webpage.<img style="WIDTH: 300px; HEIGHT: 400px" onmouseover="" onmouseout="" 
onmousedown="" border=0 hspace=0 alt="" align=right 
src="cid:5644an$IN988013685912113@BroWeber-Home" 
width=300 height=400><br></p>
<p align=left> </p>
<p align=center> </p>
<p align=center> </p>
<p align=center> </p>
<p align=center> </p>
<p align=center> </p>
<p align=center> </p>
<p align=center><a 
href="http://kjab.com/mailman/listinfo/streaming_kjab.com"><font size=1>Click 
here to unsubscribe</font></a></p>
</body>
</html>