Update On Tower Install As Of Friday

Much has happened in the last couple of days.  All of the tower work is completed and the transmitter is up and running.  Thursday we applied full power to the transmitter and completed the field tests required by the FCC.  We now have everything completed to file the final application with the FCC.  We were able to get some folks to tune in during the test and although if was a very limited number of people the results were good. 

Now we are at the hardest part of waiting for final approval.  This could take a few days to a few weeks.  We are praying for a speedy turn around for this license. Pray with us as well.

Money for the expansion continues to come in. We have had about $3,000 come in this week.  We are still trusting the Lord for $15,000 to come in this week.  We have bills that will need to be paid this week.  Could you help us with a gift to the KJAB Expansion?  All gifts are tax deductible and can be made to KJAB Christian Radio.  You can mail them to 621 W. Monroe  Mexico, MO  65265 or you can visit our Donations page to send a gift by credit or debit card or PayPal. 

.
 

 

 

 

 

 

 

 

Expected Expenses for the KJAB Expansion 

ITEM COST PAID
Transmission Line 10,525.50 PAID
Nautel 1Kw Exciter 7,467.00  
Tube for Transmitter 1865.00 PAID
Kit to Re-tune Transmitter 2,288.11  
Engineer Expense (Tower Setup) 1,041.12 PAID
Engineer Expense (Antenna Install) 1,522.38  
Tower Climber 6,500.00 PAID
Patch Panel, Rigid line, Flanges, etc 6,150.00  
Surge Protection 4,000.00  
Bird Meters 1,392.00  
Composite DA 359.00  
5 Ton Air Conditioner 3,116.09  
Air Conditioner Duck Work 3,000.00  
Air Conditioning Install 500.00  
Electrical Supplies 2,622.22 PAID
Culvert 225.00  
Bobcat Rental 200.00 PAID
Rock Delivery 75.00 PAID
Miscellaneous 2,124.44  
Electrical Supplies 244.17 PAID
Construction Materials 250.45 PAID
Parts for Studio Transfer Authorization 680.94  
FCC Attorney Retainer 1,000.00 PAID
Andrew Line Dehydrator 1,026.62  
Engineering for Studio Trans Auth 1,000.00 PAID
Total Minus What is Paid 33,785.61  
Money available as of 5/20/13 10,178.23  
Adjusted Total Need 24,107.38  

  